Skip to content
4.9 from 47 Google reviews Building since 2007
Mon to Fri, 8 AM to 5 PM (978) 833-7337
Request Estimate
Home About
Services
Projects
Where We Build Reviews Blog Request Estimate (978) 833-7337
Bedroom suite opening to its own bath in a Norman Builders home addition, Amesbury MA
ADUs & In-Law Suites · Northern MA & Southern NH

ADU Design & Build in Northern MA & Southern NH

A second, self-contained home on your lot for a parent, a grown child or a tenant, designed, permitted and built by one team.

Based in
Newton, NH
Building since
2007
MA size limit
Up to 900 sq ft
NH size floor
At least 750 sq ft
Permits
Handled for you
Approach
Design / Build

An accessory dwelling unit (ADU) is a small, complete home on the same lot as your house, with its own place to sleep, cook and bathe. Norman Builders, a design-build company based in Newton, NH, builds in-law additions and garages and designs ADUs around each lot for homeowners in the Merrimack Valley, the North Shore and southern New Hampshire, with one team from the first design through permits and the final inspection.

Three Ways to Add an ADU

Attached: an addition built onto your house, or space inside it such as a basement or attic, set up as its own unit. In-law additions are part of our home additions work, and an attached ADU involves the same foundation, framing and roofline tie-in as any addition.

Detached: a stand-alone cottage in the yard on its own foundation. It needs the same steps as a small new house, from foundation and utilities to finishes, which is the work we do on custom homes; we scope it after seeing your lot.

Over or in a garage: an apartment over a new or existing garage. We build attached and detached garages from the ground up and can scope a unit above or inside one after a site visit; our guides on garage plans with a loft and rooms over garages cover the structural and code questions.

What Massachusetts Now Allows

Since February 2, 2025, the Affordable Homes Act lets Massachusetts homeowners build one "protected use" ADU by right in single-family zoning districts, under the state regulations at 760 CMR 71.00. It can be up to 900 square feet or half the floor area of the main house, whichever is smaller. A town cannot require a special permit for it, cannot require the owner to live on the property, and cannot require more than one parking space for it (or any, near public transit). The unit needs its own entrance, and normal building code, septic or sewer, and local rules such as setbacks and short-term rental limits still apply. We check your town's bylaw before design starts. Source: the state's ADU guidance at mass.gov.

What New Hampshire Now Allows

New Hampshire's ADU law was rewritten by HB 577, effective July 1, 2025 (RSA 674:71 to 674:73). Where a town allows a single-family home, it must allow one ADU by right, attached or detached, without a special exception or conditional use permit. Towns can set a size limit, but not below 750 square feet; if a town sets none, the law caps an ADU at 950 square feet, and a town can allow more. A town may require the owner to live in one of the two units. The water supply and septic must be adequate for both, but separate systems are not required, and an existing detached structure such as a garage can be converted even if it doesn't meet today's setbacks. Each town words its ordinance differently, so we read yours first. Source: the New Hampshire Municipal Association's guide to the 2025 ADU law.

What Decides the Design

On an ADU the site does as much of the design work as the floor plan. Early on we look at your lot and zoning, the septic system or sewer connection, the water supply, where electric service comes in (New Hampshire's law says a town cannot deny an ADU its own electrical panel and service), driveway and parking, and how the unit's entrance and windows sit relative to the main house. Inside, a small plan has to fit a full kitchen and bath, so we plan storage, laundry and accessibility, such as a step-free entry and a wider door into the bath for a parent who wants to age in place, from the first sketch.

Timeline and Cost

We haven't published an ADU case study yet, so we won't quote an ADU-specific schedule or price here. The closest guide is our home addition timeline, which puts a realistic addition at about 4 to 9 months or more, design and permits included. A new foundation, septic upgrade or utility work adds time. Cost depends on the size, attached or detached, the kitchen and bath, and the site work. As with every design-build job, the plans are approved with a clear agreement on budget and timeline before construction starts.

What Homeowners Say

These reviews are from Norman Builders additions, the work an attached ADU builds on.

"Norman Builders did a fantastic job with our home addition project. Their attention to quality, detail, and superior workmanship has produced a finished product that is the envy of the entire neighborhood." (Don Z., Newburyport, MA)

"The addition is a real enhancement to our home and well worth the effort." (Roland M., North Andover, MA)

The Process

From Zoning Check to Move-In

Design and construction run through one team, so the ADU you approve on paper is the one that gets built.

  1. 1

    Site & Zoning Check

    Who the unit is for, your budget, and what your lot, septic and town bylaw allow.

  2. 2

    Concept Design

    Attached, detached or over a garage: a floor plan and a budget that match.

  3. 3

    Plans & Permits

    Final selections and building plans, a written agreement, then the permit applications.

  4. 4

    Build

    Foundation through finishes, with inspections and updates at each stage.

  5. 5

    Walkthrough

    We walk the finished unit with you and close out the punch list before move-in.

FAQ

ADU Questions

What is an ADU?

An accessory dwelling unit is a second, self-contained home on the same lot as a single-family house, with its own sleeping, cooking and bathroom facilities. It can be attached to the house, inside it, detached in the yard, or over a garage.

Is an ADU the same as an in-law suite?

Often, yes. An in-law suite becomes an ADU when it is a complete unit with its own kitchen, bath and entrance. A bedroom and bath without a kitchen is usually treated as part of the main house instead.

Can I build an ADU in Massachusetts without a special permit?

Yes, for one protected-use ADU in a single-family zoning district, since February 2, 2025. It can be up to 900 square feet or half the size of the main house, whichever is smaller. You still need a building permit, and local rules like setbacks and short-term rental limits still apply.

How big can an ADU be in New Hampshire?

Under the 2025 law a town cannot cap an ADU below 750 square feet. If the town sets no limit, the cap is 950 square feet, and many towns allow that or more. We check your town's ordinance first.

Do I have to live on the property?

In Massachusetts, a town cannot require owner occupancy for a protected-use ADU. In New Hampshire, a town may require the owner to live in either the main house or the ADU.

Can I convert my garage into an ADU?

Often, yes. New Hampshire now lets owners convert an existing detached structure such as a garage even if it does not meet current setbacks. In either state we check the structure, foundation, insulation and utilities first, since a garage is rarely built to living-space standards.

Do I need a separate septic system?

Not necessarily. New Hampshire's law says separate systems are not required, but the system has to be adequate for both units, which can mean an upgrade. In Massachusetts the septic system is sized by bedrooms under the state septic code (Title 5), so we look at it before design.

How do I get started?

Request an estimate or call (978) 833-7337. The first conversation covers who the unit is for, your lot and your budget.

Ready to Plan Your ADU?

Tell us about your lot and who the unit is for, and we will start with what your town allows.